***Please note: Applications accepted now for May 2026 occupancy. Property closing anticipated late April 2026. Lease execution and move-in funds due at closing. __________________________ This brand new 2025 construction apartment qualifies full-time University of Chicago and UChicago Medicine employees for up to $2,400 in rental assistance through the UChicago Employee Assistance Program — covering first and last month’s rent for eligible staff in the Woodlawn Focus Area. Located in rapidly transforming Woodlawn, this stunning 3-bedroom, 2-bathroom residence spans 1,357 square feet of thoughtfully designed new construction living space featuring white oak hardwood floors, 9-foot ceilings, and open-concept layouts flooded with natural light. The designer kitchen features custom 42-inch white oak shaker cabinetry, Quartz Calacatta countertops with a waterfall-edge peninsula, and professional-grade stainless steel appliances. Spa-inspired bathrooms include custom floating vanities, designer porcelain tile, and a frameless glass-enclosed rain shower. Key Features: ∙ One parking spot wired for EV charging ∙ In-unit washer and dryer ∙ One-year builder’s warranty Nearby: ∙ 5-minute walk to CTA Green Line ∙ University of Chicago campus and Medical Center ∙ Obama Presidential Center — opening June 2026 ∙ Woodlawn Central (coming soon)— $895M mixed-use development at 63rd Street Requirements: ∙ 680+ credit score ∙ Income 3x monthly rent ∙ Small pets considered (25 lbs or under, $350 deposit) ∙ Security deposit: $2,595 | First month’s rent: $2,595 | Total move-in: $5,190